Profile Overview
Consultant in JSW Energy from 01.09.2015 onwards. Looking after the Hydro Portfolios of JSW Energy.
Director in Himachal Baspa Power Company Limited w.e.f. 01.03.2015 to 31.08.2015 at Karcham Wangtoo HEP & Baspa-II HEP at Sholtu
Managing Director in M/s Jaiprakash Power Ventures Limited from 26.07.2011 to 28.02.2015.
- Execution of Prayagraj Thermal Power Project (3×660 MW) at Bara, District Allahabad (U.P) w.e.f. 01.02.2012 to 30.11.2012
- Operation, Maintenance of Karcham Wangtoo Hydro-Electric Plant (4×250 MW) and Baspa HE Plant (3×100 MW) at Sholtu, Distt. Kinnaur (H.P) w.e.f. 01.12.2012 to 28.02.2015.
Chairman & Managing Director in SJVNL Limited from 18.7.2005 to 25.2.2011 (Pay scale : 80000-125000)
SJVNL Limited a Schedule “A” – Miniratna Central Public Sector Undertaking (CPSU) under Ministry of Power, Govt. of India, is a joint venture between GOI & GOHP. The present installed capacity of SJVNL is 1500 MW through Nathpa Jhakri Hydroelectric Power Station. The capacity addition under execution by the Corporation is of 2,962 MW (412 MW Rampur HEP – under construction, and 2,550 MW under different stages of investigations.)
Director (Civil) in Satluj Jal Vidyut Nigam Ltd. At Shimla & Jhakri.
23.10.03 to 17.07.2005
All the Design work; construction & Contract work of SJVNLL. Also commissioning of all the six units of 250 MW each with in six months which has set a new benchmark in the history of Hydro Electric Field.
General Manager in Satluj Jal Vidyut Nigam Ltd. at Nathpa Jhakri HE Project.(Head of Project)
24.07.03 to 23.10.03
Construction of Concrete Dam, Intake Structure and Desilting Chambers & HRT etc.+ commission of Unit No. 5 successfully at site.
Chief Engineer Civil at Nathpa Jhakri H.E Project, Distt Kinnaur (H.P.) (Re-designated as Additional General Manager on 3rd May 2002.
1.7.2001 to 23.7.03
Construction of Concrete Dam, Intake Structure and Desilting Chambers & HRT + 16 Kms. Section Overt lining Etc. Completion of all 5 No Sluice Liner in a single season : More than 1 km of concrete lining in a month for two concluding months etc
Dy.Chief Engineer in Konkan Railways Corporation (K.R.C.L.) At Ratnagiri in Maharashtra (On deputation from N.H.P.C.)
1.03.93 to 31.07.96
Construction of Tunnels Railway Tracks in cutting, filling, Bridges, Aquqducts ROBs, RUBs etc. Track linking and welding of rails by special Japanis railwelding machines
JE/AE/Engineer/ Dy.Manager/Manager/ Manager/Sr. Manager
July, 1976 to Aug, 2000
In various projects and in organizations like HPPWD,Haryana Irrigation, NHPC etc